Portal de Yecla

www.portaldeyecla.com

Yecla - SpanishYecla - English
detail of Yecla

 

A great arc of 6 feet tall and 40 long bridge will crown the old 'Ratchet' (27/09/2010)

The ground configuration of the new infrastructure will remember its former use by simulating the railroad tracks

The work, which is running a business in the city, will be completed before year end

The old bridge 'Buzzer' will serve the yeclanos.

Now your users do not travel on the legendary train, but he will strut about on foot or by bicycle.

The Council is working on this infrastructure, next to the first kilometer of the road Villena, with which it will recall a most symbolic buildings in the city.

To further accentuate its aesthetic significance, the work already being done yeclana company, include a wide arc of 6 feet high and 40 meters long.

The infrastructure platform will be located 3 feet above the boardwalk that crosses the bridge, so the highest point of the arc to reach 9 feet above the ground.

The surface of the new bridge deck will continue the sidewalk and the bike path that runs along the road in the first kilometers Villena.

As it crosses the bridge, the road surface of these simulated wood studs and metal rails of a real railroad.

This will recall the old use of the bridge remained standing barely nine pillars that supported it.

The work, which will be lit at night and will be finished before Christmas, is being conducted by the Domestic Services and Industrial yeclana with a budget of 107,000 euros.

Source: Ayuntamiento de Yecla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información