Portal de Yecla

www.portaldeyecla.com

Yecla - SpanishYecla - English
detail of Yecla

 

The CHS authorizing a new well to ensure urban supply Yecla (15/12/2010)

The president of the Hydrographic Confederation of Segura (CHS), Charo Quesada, today presented the Mayor of Yecla, Juan Miguel Benedito, the authorization of the basin for the City Council conduct a new well yeclano deeper than the two existing with the aim of ensuring urban water supply to the population of the municipality of the Highlands and avoid, in this way, the restrictions suffered by the municipality.

Due to declining aquifer levels Cingle-knife, the two wells for the supply of the population had trouble extracting water, so that the CHS has given the green light to a third survey, called the Clover, which will bring the flow about 400 meters deep.

In this way, the City of Yecla urban water supply will be guaranteed without the need to extract more water than was removed so far (nearly 3 cubic hectometres).

The construction of the survey was done in two phases, the first reaching a depth of 200 meters to meet the needs of the people immediately, and a second phase in which reprofundizaría to 400 meters.

At the meeting held at the headquarters of the CHS, the mayor was accompanied by the spokespersons of the city, and thanked the president of the basin organization of processing speed and, thus, the restrictions are gone .

Source: CHS

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información