Yecla IU-Greens today called explanation from the mayor of the municipality, Marcos Ortuño, on the collapse of a retaining wall "Third Institute" forged lacking.
The left-wing organization, who explained that the school is being built by the company The General has urged the mayor to detail "how they are meeting the certificates to make them all work so severe shortage in building construction. "
He noted that the lack of forged, used to reinforce concrete, has been the cause for which the wall has fallen after heavy rains in recent days, and has accused the City Council does not control and monitor the works are run properly.
"We do not want to think what would have happened if there had been workers working that day or if this strong torrential have occurred with the institute now fully operational and students within the school," he concluded.
Source: IURM