Portal de Yecla

www.portaldeyecla.com

Yecla - SpanishYecla - English
detail of Yecla

 

The third high school education opens Yecla (27/03/2014)

The building is divided into three modules, and is projected to 12 units of Secondary and 6 units of Adult Education.

The total cost of the work amounted to 4,705,980 euros.

It has a capacity for 360 pupils in secondary school and over 1,200 Adult Lessons, adding different times and ways of teaching.

The Minister of Education, Universities and Employment, Pedro Antonio Sánchez and the Mayor of Yecla, Ortuño Marcos officially inaugurated the Secondary School No 3 of Yecla.

The new educational center, which will also host adult education, lying on a plot of 10,000 square meters with the Centre for Mental Health at the Las Herratillas.

The building is divided into three modules, and is projected to 12 units of Secondary and 6 units of Adult Education.

In total, the sum built area more than 4,500 square meters.

The total cost of the work amounted to 4,705,980 euros.

This center started its operation in the 2013/14 year, with two units of 1 common and ESO unit 1st ESO in the form of Spanish / English bilingual, like the other two secondary schools in the city .

It has a capacity for 360 pupils in secondary school and over 1,200 Adult Lessons, the latter be attended at different times and combine the modalities of classroom and distance learning.

The implementation of this IES can give more space to all secondary schools in the town and at the same time, bring together in one center all offer adult education

The first of the three buildings on two floors, standing at ground floor an entrance porch, the main lobby, general administrative services, multipurpose classroom, concierge, secretarial staff room.

On the first floor are arranged twelve multipurpose classrooms.

The second flag is accessed from the first through a covered walkway and glass walls.

It has two floors and basement.

Downstairs the main lobby, library, cafeteria ten seminars, management team offices and two classrooms of higher ranks.

On the first floor three multipurpose classrooms, two classrooms largest, two computer labs, technology workshop, plastic classroom, music classroom and laboratory are provided.

The last flag, which is also accessed by a covered walkway, as has been conditioned gym and locker rooms.

Outside you have constructed two outdoor sports courts and parking, reserving 390 m2 for future expansion.

The modular and transparent character applied in the construction of the secondary school allows maximum flexibility and alternative uses of spaces.

Priority has been given to keeping the economy, both in its overall design and in their construction, materials and facilities solutions, so as to ensure greater durability with less maintenance costs, without prejudice of good architectural quality.

Source: Ayuntamiento de Yecla

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información