Thus the plans to construct rural roads are recovered by the Ministry of Agriculture, demonstrating a commitment to one of the most important productive sectors, both regionally and our town
The collaboration between the Ministry of Agriculture and the City of Yecla allow improve our municipal infrastructure, achieving improved access for farmers, their agricultural plots.
This time the action was performed in the way of "The Cabezuelas" which connects the end of the road asphalting "The Brigadiela" to the existing pine forest on the Carretera de Villena, so, this performance is to structure the agricultural plots Southeast our municipality.
The action taken was developed for 2.5 kms.
in length which has improved rolling final layer by hot asphalt agglomerate of 4 cm thick and has been provided vertically in the two access signaling path.
The tarmac was performed on the existing platform based zahorra who ran the City Council with the prior expansion in substantially the entire length of the road, which facilitated the neighbors, in order to obtain an average width of 4.8 m (between 4.5 and 5 m).
The investment was 51,000 euros.
Thanks to the processing of EU funds, the Ministry of Agriculture, Government of Murcia, fosters improved agricultural infrastructure, allowing a significant improvement in the conditions of access by farmers to their workplace.
Councilman Agriculture, Jesús Verdú, stressed that "this way the plans to construct rural roads are recovered by the Ministry of Agriculture, demonstrating a commitment to one of the most important productive sectors, both the region and in our municipality. "
Source: Ayuntamiento de Yecla